Sunday, October 25, 2026
AI Infrastructure · News & Analysis
Home › Capital Markets › Report
Capital Markets · Report

Oklo files 10-Q: quarterly report (10-Q)

Quarterly report — latest revenue, margins and guidance.
Official disclosureSlicast · May 12, 2026 at 12:00 UTC · US · Source: SEC EDGAR · OKLO

Overview

We founded Oklo in 2013 with the goal of revolutionizing the energy landscape by developing clean, reliable, affordable energy solutions at scale. According to the International Energy Agency, global electricity production is expected to increase over 75% by 2050 driven by electrification of buildings, transportation, and industry; increased use of air conditioning in the developing world; and increased consumption from data centers and cloud services. Our business addresses this demand by producing electricity and heat from our Aurora powerhouses which can run on fresh, recycled, or down-blended nuclear fuel. We are also commercializing nuclear fuel recycling technology that can convert used nuclear fuel into usable fuel for our powerhouses and those of others.

The fast fission reactor technology we are commercializing was demonstrated by the Experimental Breeder Reactor-II (“EBR-II”), a fast fission plant that was operated by the U.S. government for 30 years. Our powerhouse product line, called the “Aurora,” builds on this legacy of proven and demonstrated technology. Our Aurora powerhouse product line is designed with embedded safety features, to be able to run on fresh, recycled, or down-blended fuel, and to produce 15-75 megawatts electric (“MWe”) and has the potential to expand powerhouse size to produce 100 MWe and higher.

Because the Aurora powerhouses are designed to operate by utilizing the power of high-energy, or “fast,” neutrons, they are expected to be able to tap into the vast energy reserves remaining in existing used nuclear fuel from conventional nuclear power generation facilities, which only use approximately 5% of the energy potential in the nuclear fuel before needing to refuel. The U.S. nuclear power industry has produced approximately 20% of U.S. electricity over the last 30 years and generated over 90,000 metric tons of used nuclear fuel. We estimate that the existing energy reserves contained in the used nuclear fuel in the U.S. that are made accessible through our fast fission reactor technology are equivalent to approximately 1.2 trillion barrels of oil equivalent (BOE), nearly five times the oil reserves of Saudi Arabia.

Fission is an energy-dense process, producing approximately 50 million times more energy than combustion.

We have achieved several significant deployment and regulatory milestones for our first Aurora powerhouse. Notably, we secured a site use permit from the U.S. Department of Energy (“DOE”) for the Idaho National Laboratory (“INL”) site and received a fuel award of five metric tons of HALEU produced from recovered uranium from previously irradiated EBR-II fuel from INL for a commercial Aurora powerhouse in Idaho. Related to the construction and operating licensing process of the Aurora powerhouse, we have also submitted the Nuclear Safety Design Agreement and the Preliminary Documented Safety Analysis to the DOE for the Aurora powerhouse at INL ("Aurora-INL"), which represent the first two of five steps in the DOE regulatory pathway for nuclear facility operation. Early in 2026, the DOE approved the Nuclear Safety Design Agreement. Related to our first Aurora powerhouse, the DOE and the INL have completed the environmental compliance process addressing the DOE requirements for site characterization. This process, resulting in an Environmental Compliance Permit, marks a milestone as we advance our plans to deliver the first commercial advanced fission power plant in the U.S.

We have been tentatively selected to provide electricity and heat to Eielson Air Force Base outside of Fairbanks, Alaska. Our robust pipeline of potential customer engagements spans a number of industries. For example, we have signed non-binding letters of intent with Equinix, Inc. ("Equinix"), Diamondback E&P LLC ("Diamondback Energy"), and Prometheus Hyperscale (formerly Wyoming Hyperscale White Box LLC) ("Prometheus Hyperscale"). In December 2024, we signed a 12 gigawatt (GW) Master Power Agreement with Switch, Ltd. ("Switch"), one of the largest corporate power purchase agreements ("PPA") in history.

On January 5, 2026, we entered into a prepayment agreement (the "Prepayment Agreement") with Meta Platforms, Inc. ("Meta") that advances plans to develop a 1.2 gigawatt power campus in Pike County, Ohio, to support Meta’s data centers. The Prepayment Agreement provides a mechanism for Meta to prepay for power and provide funding to advance powerhouse deployment. Pursuant to the Prepayment Agreement, the Company will use Meta's funding to secure nuclear fuel, advancing the first phase of the project.

We are exploring opportunities with the Tennessee Valley Authority (“TVA”) to recycle the utility’s used fuel at a new facility and to evaluate potential power sales from future Oklo powerhouses in the region to TVA. The market interest in our solutions exemplifies the potential demand for the size range of the Aurora powerhouse product line and our differentiated business model. We have an ambitious target of deploying our first powerhouse in 2028 amidst a range of supply chain, construction, macroeconomic, and design complexities.

In addition to deployment milestones, we have made significant progress in our nuclear fuel recycling and fuel fabrication efforts and in securing fuel. The DOE has reviewed and approved our Safety Design Strategy, Conceptual Safety Design Report, Nuclear Safety Design Agreement, and Preliminary Documented Safety Analysis for the Aurora Fuel Fabrication Facility at INL—all key milestones as we advance toward our goal of utilizing recovered nuclear material to fuel our first commercial Aurora powerhouse. Our Aurora Fuel Fabrication Facility was also selected under the DOE Fuel Line Pilot Program ("FLPP"). The FLPP allows for acceleration of permitting, construction, and operation of nuclear fuel production lines for research, development, and demonstration purposes, supporting a fast-track approach to commercial licensing.

In addition, we successfully completed the first end-to-end demonstration of the key stages of our advanced fuel recycling process, in collaboration with Argonne and INL. This marks a significant step forward in scaling up fuel recycling capabilities and deploying a commercial-scale recycling facility. In September 2025, we announced plans to design, build, and operate a fuel recycling facility in Tennessee as the first phase of an advanced fuel center (the "Advanced Fuel Center") to recycle used nuclear fuel into fuel for fast reactors, including our Aurora powerhouse line. The facility, which includes a roadmap of up to $1.68 billion in investment, will be the first of its kind in the U.S. and we estimate that it has the potential to create more than 800 high-quality jobs.

We have completed a licensing project plan for the fuel recycling facility with the NRC and are currently in pre-application engagement with the regulator’s staff.

Read the original
Oklo files 10-Q: quarterly report (10-Q) · Slicast